8474Mixer Operation G.1 The TRR operational sequence would be as follows: AUTOMATIC OPERATION SEQUENCE 1. SET selector switch to AUTO position 2. LOAD portable container into machine 3. CHECK main swi
Availability: | |
---|---|
Quantity: | |
operational sequence would be as follows:
1. SET selector switch to AUTO position
2. LOAD portable container into machine
3. CHECK main switch is ON (I=ON)
4. CHECK e-stops are released (One on panel, Four on machine)
5. CHECK pilot lamp is ON (Safe operation indication)
6. CHECK key switch is ON (For normal operation)
7. SET the mixing timer (Mixing time)
8. SELECT the portable container up switch
9. START of the cycle (Continuous siren during operation)
• Lifting of portable container
• Rotation 1800up to the mixing position
• Mixing operation for pre-set time
• Rotation down to material levelling position
• Start for cleaning rotor
• Rotation down to lower portable container
• Portable container down for dust extraction
• Lowering of portable container
10. END of cycle(Continuous siren stops)
11. UNLOAD portable container from machine
operational sequence would be as follows:
1. SET selector switch to AUTO position
2. LOAD portable container into machine
3. CHECK main switch is ON (I=ON)
4. CHECK e-stops are released (One on panel, Four on machine)
5. CHECK pilot lamp is ON (Safe operation indication)
6. CHECK key switch is ON (For normal operation)
7. SET the mixing timer (Mixing time)
8. SELECT the portable container up switch
9. START of the cycle (Continuous siren during operation)
• Lifting of portable container
• Rotation 1800up to the mixing position
• Mixing operation for pre-set time
• Rotation down to material levelling position
• Start for cleaning rotor
• Rotation down to lower portable container
• Portable container down for dust extraction
• Lowering of portable container
10. END of cycle(Continuous siren stops)
11. UNLOAD portable container from machine