Installation and Commissioning :
Will be made by on site of customers plant . we will give us
supportand provides all necessary plans and drawings for a
proper installation.
Final Acceptance Test :
A. Venue: customer plant location
B. Functional and Specification Tests/Inspections
1. Same as in the Pre-dispatch Inspection
C. Final Acceptance Test Run
1. Same method and criteria as in the ATR in the Pre-
Dispatch Inspection except:
a) Test duration: up to customers
b) Criteria as per Pre-dispatch Inspection
D. Color Change as per Color Change in Acceptance Tests
in the Pre-dispatch Inspection
E. Start up and run another batch per ATR
1. Test Duration: to produce several quantities product.
2. Criteria as per Pre-dispatch Inspection